The following table summarizes the specifics of the equipment the Library will need to supply. The computer hardware, network wiring, and printer that will be supplied by AcIS are not included since our current equipment can be used until the cycle for replacing and adding additional units comes around.

The sources for the equipment are as follows:


 
Public Space
Equipment Needed Anticipated Source
10 tables for computer stations each at least 50" wide IAB 215, 20 tables can be used, two for each station
2 tables for work with manuals IAB 201
1 round table for consultations IAB 201
20 chairs: 10 for computer stations and 10 for tables IAB 215
9 single-sided wall units; 36"w x 9"d x 84"h and will be setup for 6 shelves each with canopies Library Supply
Budget required for removing at least 2 units and reassembling all units
1 round table for consultations IAB 201
guide racks for 40 user guides IAB 201 for 10 slots
Library budget for 30
tile on the floor and wiring removed Library budget
phone line that is convenient to the work stations
use the 854-46012 number
Library budget
sign for the entrance Library budget

 
Open Staff Space
Equipment Needed Anticipated Source
2 desks IAB 201
2 computer tables IAB 201
2 work tables IAB 215
5 chairs IAB 215
2 shelving units IAB 201
1 bulletin board IAB 201
1 phone line Library budget

 
Secure Staff Space
Equipment Needed Anticipated Source
1 computer table (48" wide) for the server IAB 201
1 chair for the server station IAB 215
2 CD-ROM cabinets that can hold 1400 CDs and DVDs IAB 201 has one cabinet that holds 840
Library budget required for a second one
1 storage unit for supplies IAB 201
1 cupboard for personal items and cleaning supplies IAB 201