most recent pictures - construction in progress (Date: as posted)
chamber analysis by the finite element method the centrifuge is moved to its permanent location location of the eight anchors - to the bed rock the wall of the chamber, showing the reinforcements the construction inside the chamber the roof is propped before concrete pouring the reinforcements at the roof

the roof after concrete is poured the outside of the chamber ready for coating the outside of the chamber with base coating the outside of the chamber with base coating the outside of the chamber with base coating the outside of the chamber with base coating the outside of the chamber with base coating the outside of the chamber with base coating


 Site Investigation

locate the center for the centrifuge chamber

drill through the floor and foundation (10/25/2002)

the rock sample from the foundation (10/25/2002)

Template on the floor, ready for cutting (7/23/2003)


Excavate into the  rocks. Preparing foundation (8/2/2003)


Parts for the centrifuge chamber