most recent pictures - construction in progress (
Date: as posted)
Site Investigation
locate the center for the centrifuge chamber
drill through the floor and foundation (10/25/2002)
the rock sample from the foundation (10/25/2002)
Template on the floor, ready for cutting (7/23/2003)
Excavate into the rocks. Preparing foundation (8/2/2003)
Parts for the centrifuge chamber