  1856: Page 45  



45
 

DETAILS OF EXPENSES,

SOME   OF  WHICH  ARE  INCLUDED   IN  THE  PRECEDING  TABLES.

56. For  removing  slides in cuts,  opening  ditches, raising  and

widening the embankments,..........................     $17,100 84

56. For repairs and renewals of masonry in culverts, bridge abut¬
ments and piers, cattle guards and passes,........,......       $7,724 84

56. For repairs of retaining slope and vertical walls,...........       $1,292 19

56. For ballasting, including the cost of land from which the ma¬
terial was procured,.................................     $28,300 00

56. The repairs and use of the engines and cars engaged in the

transportation of all materials used in repairs,...........     $22,415 72

56. The number and kind of cross ties renewed.    Principally oak

and chestnut,.......................................           124,594

56. The cost of the same, including tbe expense of laying them

down,.............................................     $71,224 92

56. The cost of adjusting the track,.........................   $209,455 75

56. The cost of repairs and renewals of truss bridges, where they

have been originally charged to construction,...........     $18,236 38

58. The length in feet of the iron rails used in renewals of all

tracks which have once been charged to construction,-----           402,654

58. The weight of the same in tons,.........................       3,707-2f ii

58. The cost of the iron rails and the expense of laying them

down, including the value of chairs and spikes........... $162,668 73

58. The length in feet of iron rails which have been re-rolled, —           260,952

58.  The weight of the same in tons,.........................       2.S27-A-A-

68. The cost of the same,..................................     $71,305 29

59.  The cost of  repairs of passenger, freight, wood and water

stations,...........................................     $63,078 29

59. The same of engine and car houses, machine and work shops,     $23,933 25

59.  Tbe rents paid for the use of buildings for depots, offices,

dwellings, &c.,.......................................       $5,162 00

60.  The cost of I'epairs of fences and gates, farm and I'oad cross¬

ings, ..............................................     $11,886 63

60.  The cost of new fences and gates, farm and road crossings,..       $2,000 00

61.  Taxes on real estate and other property,..................   $143,053 49

76. Aggregate of wages paid to porters, watchmen, signal men,

switch tenders,........................,............   $166,296 68

For hire, rents or leases of land, buildings, &c.,............     $23,813 12
  1856: Page 45