|
Current Columbia Tasks, 4/19/2001
Metadata Preparation |
EADMaker Review | Columbia
Finding Aid | Images |
Communication
- red text is new or changed
task from previous tasklist
- green text under Status
is new or changed status.
| 1. |
Metadata Preparation |
Status |
| 1.1. |
Extract RLIN G&G metadata and experiment
with output formatting options (e.g., delimited, MS Access, HTML,
Excel) (Bertchume, Davis) |
Completed, 4/12/01 |
| 1.2. |
Evaluate extract and develop spec for 4
versions of file:
a) imaging vendor operational metadata/documentation (Bukowy)
b) contribution to G&G project database (Parks, Blitz)
c) use internally for EAD preparation, etc. (Parks, Blitz)
d) image selection Access spec for annotation template
for Ted Bosley (Parks, Blitz) |
In progress, 4/19/01
In progress, 4/19/01
In progress, 4/19/01
Need by 6/18 |
| 1.3. |
Clean up G&G records in RLIN as needed (Parks, Blitz)
|
In progress 4/19/01; expected
by first week of May |
| 1.4. |
Catalog photos and other project-related
materials in RLIN VIM, etc. (Parks, Blitz) |
In progress, 4/12/01; target
date is 6/18/01 |
| 1.5. |
Download any new or changed RLIN records
into CLIO (Parks, Blitz) |
Pending discussion
with Gary, 4/19/01 |
| 1.6. |
Document any RLIN-to-CLIO record splits
(Parks, Blitz) |
In progress |
| 1.7. |
Re-extract G&G metadata & re-output
to mdb & html (Bertchume) |
|
| 1.8. |
Determine the format of image links to
be included in data contributed to Project, and generate in metadata
(Bertchume, Witte, Davis) |
Robbie to provide SPD
with relevant bkgnd |
| 1.8.1. |
Create input template
in MS Access for Ted Bosley to do image selection when he is here
6/18/01 (Bertchume) |
Awaiting spec from
Parks |
| 1.8.2. |
MMF: Add code/value to
schema to indicate selection for project? (Davis, Bertchume) |
|
| 1.9. |
Provide full CU G&G metadata to G&G
Project Coordinator in format to be negotiated (Bertchume, Davis) |
|
| 2. |
EADmaker Review & Testing |
Status |
| 2.1. |
Make EADmaker available to Avery, LSO, Preservation over the network
to review for use in this or related projects (Davis, LSO)
|
Completed, 4/9/01 |
| 2.2. |
Determine feasibility of loading RLIN data
into EADmaker (Davis, Bertchume) [NB: Not currently feasible; may
be feasible after EAD/MARC loaders have been prepared by Berkeley
in several months.] |
Completed, 4/10/01 |
| 2.4. |
Determine feasibility of creating real-time
views (Access reports) of EADmaker data for operational use (Davis,
Bertchume) |
On hold pending outcome of 2.2 above |
| 2.5. |
Perform detailed analysis of whether EADmaker
could be developed as front-end or component of MMF (Davis, Bertchume,
Wolven, LSO) |
|
| 3. |
Columbia G&G Local Finding Aid |
Status |
| 3.1. |
Obtain & install XMetal in Avery & LSO (includes configuring
with EAD DD & appropriate style sheets) (LSO)
|
In progress 4/12/01 |
| 3.2. |
Convert & reformat G&G RLIN metadata
into EAD-like document structure (Bertchume/Davis/Blitz) |
|
| 3.3. |
Load G&G extract into XMetal and finish
up finding aid creation (Blitz, Parks) |
|
| 3.4. |
Convert finding aid into HTML & publish
to LibraryWeb (with all image links) |
|
| 4. |
Image Digitization |
Status |
| 4.1. |
Investigate MrSid licensing and technical
requirements (Davis, Millman) |
In progress, 4/12/01 |
| 4.2. |
Determine which G&G project drawings
should be rescanned to highlight on web site (Parks, Giral) -- now
via BP customer order |
Expected 4/24/01 |
| 4.3. |
Complete, circulate & send out RFP; select vendor; establish
timetable for deliverables (Bukowy, Giral)
|
Expected first week
of April |
| 4.4. |
Provide metadata/accession number listing
to vendor (Bertchume, Bukowy) |
|
| 4.5. |
Digitize ca. 400-500
photographs in-house (color transparencies & bw prints) ; use
same Access DB template as for outside vendor. |
|
| 5. |
Project Communication / Collaboration |
Status |
| 5.1. |
Make available on web Columbia G&G
metadata and technical specs for review by other project participants
(Davis) |
In progress, 4/12/01 |
| 5.2. |
Spec out & generate name and subject
lists to share with partners as possible project authority files/thesauri
(Blitz, Bertchume) |
Spec completed 4/12/01;
pending GB action |
| 5.3. |
Send Columbia metadata specs/ format for dates/date spans to partners
(Davis)
|
|
|