TUESDAY, DEC. 31, 1901.
Routine work.
Temperature to-day at 9, 12 and 5:45 o'clock, 36, 40 and
38 degrees respectively. Weather, clear.
WKDireSDAY, JANUARY 1, 1902.
(Holiday ) V/alked over the work from 14th St. to 96th
St. Pound Section 3 the only one where work WitS going on;
this was principall':' concreted but some excavated.
THURSDAY, JANUARY 2, 1902.
Went with Carr over Section 2 and into the West heading
at 34th St. Discussed v/ith Carr and Shaler the question of
footing for the concrete wall. Carr had. ordered a base of at
least 12 inches, but it w.is found difficult to excavate the
rock in the extreme corner of the floor in the side wall.
Pointed out to Shaler that he would obviate he diffioluty by
putting in a section of floor so as to set the foundation out
from the side wall.
Temperature to-day at 9, 12:48 and 5:45 o'clock, 22, 30
and 30 degrees -respectively. Weather, cloudy, and afterv/ards
clear.
|