Planning includes a set of milestones that can be used to track and view the progress of the APIS Validator. The milestones are based on the deliverables from the Process section.
4.1 Milestones for V1.0
- General Data Collection (Date: 7/26/2002)
- Preliminary Data Specifications (Date: 7/29/2002)
- Fully defined data specifications and initial code structure(data structures and I/O) (Date: 8/7/2002)
- Base code completed (Date: 8/30/2002)
- Structural Meta Data validation included (Date: 9/6/2002)
- Begin QA (Date: 9/6/2002)
- QA reviewed and plan of action created (Date: 9/11/2002)
- Code ready for production (Date: 9/13/2002)